LinkPasteReferences

This command creates a link node from data pasted to Scenome's clipboard by the Copy To Link command.

Using This Command

Select a group, level-of-detail, or mesh node and apply the command.

  1. Start a copy of Scenome.
  2. Load the database into which you wish to paste the link node.
  3. Start another copy of Scenome.
  4. Load the database containing the data you wish to copy.
  5. Left click the node, i.e. Group Node, Material Node.
  6. Select Edit » Copy To Link from the main menu.
  7. Go to the copy of Scenome containing the destination database.
  8. Select Edit » Paste From Link from the main menu.
  9. The software creates a link node to the source data.

Registration

Command registration information is as follows:

Category TypeInformation
ImplementationSCRIPT
ModuleLINK_SCRIPTS.SSL
CategoryLink Commands
GUID{1F91FAD4-F612-46D4-A453-4B81096121A9}
Source NameLinkPasteReferences
Interface NamePaste From Link
CoreNo
SampleYes
AccessModify [link] on main menu or link command menu.